Optimal placement and control of BESS for a distribution system integrated with PV systems
Optimal placement and control of BESS for a distribution system integrated with PV systems
저자 Kihara Hiroyuki, Yokoyama Akihiko, Liyanage Kithsiri M, Sakuma Hisato
학술지정보 The Journal of International Council on Electrical Engineering
발행정보 International council on electrical engineering 2011년
자료제공처 국회도서관 KISTI 국립중앙도서관
주제분야 공학 > 전기전자공학
<초록>
Recently, photovoltaic generation (PV) has attracted a great attention as one of green power generations. Accordingly a large amount of PV systems will be installed in residential areas in the coming years. In such scenario, reverse power flow caused by PV in feeders may cause some problems such as voltage rise over upper limits in the distribution line, and the reverse power flow into the distribution substation. Battery energy storage system (BESS) is a promising option to solve the above both problems at the same time. However, the effect of BESS depends on location of BESS. Therefore, it is necessary to consider an appropriate location in the residential distribution system to install BESS to obtain an optimal effect. This paper investigates an optimal placement pattern of BESS in the residential distribution system with certain patterns of PV installation. It has been made clear that the obtained results can determine the best placement pattern of BESS with the minimum required BESS capacity and power loss.
Recently, photovoltaic generation (PV) has attracted a great attention as one of green power generations. Accordingly a large amount of PV systems will be installed in residential areas in the coming years. In such scenario, reverse power flow caused by PV in feeders may cause some problems such as voltage rise over upper limits in the distribution line, and the reverse power flow into the distribution substation. Battery energy storage system (BESS) is a promising option to solve the above both problems at the same time. However, the effect of BESS depends on location of BESS. Therefore, it is necessary to consider an appropriate location in the residential distribution system to install BESS to obtain an optimal effect. This paper investigates an optimal placement pattern of BESS in the residential distribution system with certain patterns of PV installation. It has been made clear that the obtained results can determine the best placement pattern of BESS with the minimum required BESS capacity and power loss.
<목차>
Abstract
1. Introduction
2. Distribution System
3. OPF calculation
4. Simulation results
5. Conclusion
References
녹색건축인증 조성법' 및 '건물에너지 소비증명제'가 의무화되어 시행되고 있습니다.
저희 (주)한국녹색인증원은 '지속가능한 저탄소 녹색건축인증 기술연구소'의 전문기업으로 설립되어, 빠른 제도 변화와 변모하는 건설환경에 이바지하고자 합니다. (주))한국녹색인증원은 건축, 도시, 생태분야가 녹색건축물에 접목될 수 있도록 적절한 요소분석을 통해 에너지 절감형 건축, 자생적 생태환경, 온열환경, 빛환경의 면밀한 조사와 연구로 고객의 삶의 질 향상 및 더 나아가 인류의 존속성에 그 목적을 두고 있습니다. 한국녹색인증원은 친환경컨설팅 전문업체로 주택성능등급, 그린홈, 에너지소비총량제, 에너지성능지표검토서, 건물에너지효율등급, 장수명주택인증, CPTED, BF 인증 등 각종 친환경 건축물 인증 을 컨설팅 해드리고 있습니다. 녹색건축인증 의 선도기업이 되겠습니다.
댓글
댓글 쓰기